Every 2026 tax number on one page

Brackets, standard deduction, capital-gains thresholds, credits, and the new OBBBA deductions — one printable page instead of 40 IRS PDFs.

  • All 7 brackets for single, joint, and head of household
  • Tips, overtime, senior, and car-loan deduction caps
  • 0% / 15% / 20% capital-gains breakpoints
  • Credits, estate and gift limits, AMT exemption

It unlocks right here on the page — we don’t send emails. The Money Pocket (IZ Labs Kft.) stores your address and never sells it. Privacy policy.

Bookmark this page — it’s updated whenever the numbers change.

The Money Pocket · Printable checklist

Home Project Permit Checklist

A one-page checklist of common home projects, typical permit and inspection fee ranges, and the inspection sequence most cities follow.

Updated October 9, 2026 · themoneypocket.com

Usually needs a permit

  • New structures, additions, and anything that changes load-bearing walls, beams, or the roof structure.
  • New or relocated electrical circuits, panel upgrades, EV chargers, generators, and solar.
  • New plumbing lines, water heater replacement (in most cities), gas lines, and sewer work.
  • HVAC replacement or new ductwork.
  • Decks over 200 sq ft, more than 30 inches above grade, or attached to the house.
  • Fences over 7 ft (often lower in front yards), and any pool barrier.
  • Pools and spas, re-roofing in many jurisdictions, window or door openings that are new or enlarged.
  • Finishing a basement, converting a garage, or adding a bedroom (egress rules apply).
  • Demolition of a building or a structural part of one.

Usually exempt

Based on the model code (IRC R105.2) — your city or county can be stricter.

  • Painting, wallpaper, flooring, carpet, countertops, and cabinet replacement.
  • One-story detached sheds or playhouses up to 200 sq ft (no utilities).
  • Fences up to 7 ft and retaining walls up to 4 ft (not supporting a surcharge).
  • Small, free-standing decks under 200 sq ft and no more than 30 inches above grade.
  • Like-for-like fixture swaps (a faucet, a light fixture on an existing box).

Typical permit fee ranges

Base fee plus a value-based component, for a typical US city. Small towns run about 20% lower; high-cost metros 35% higher or more. Plan review, trade permits, and reinspections are extra.

ProjectBase feePlus, by project value
Minor remodel (kitchen, bath, no structural)$75 – $250+0.4% – 1.2% of project value
Major remodel$200 – $750+0.6% – 1.8%
Addition / structural work$350 – $1,200+0.8% – 2.5%
Small electrical (circuit, outlet)$50 – $150+0.2% – 0.8%
EV charger or appliance circuit$75 – $250+0.3% – 1.2%
Panel upgrade / service change$125 – $450+0.4% – 1.5%
Attached deck$100 – $400+0.5% – 1.5%
Elevated deck with stairs$175 – $700+0.7% – 2.2%
Backyard fence$25 – $125+0.1% – 0.6%
Pool barrier fence$100 – $350+0.3% – 1.2%
Above-ground pool$50 – $250+0.2% – 1.0%
In-ground pool$250 – $1,000+0.6% – 2.0%
Basement finish$150 – $500+0.5% – 1.5%
Basement with bathroom$300 – $950+0.8% – 2.2%
Interior demolition$100 – $400+0.4% – 1.2%
House demolition$200 – $900+0.6% – 1.8%

Get a range for your project: building · electrical · deck · fence · pool · basement · demolition.

The inspection sequence

  1. Footing / foundation — before concrete is poured.
  2. Underground / under-slab — plumbing and electrical before they’re buried.
  3. Framing — structure, fire blocking, and openings.
  4. Rough-in — electrical, plumbing, and mechanical before walls close.
  5. Insulation / energy — before drywall.
  6. Final — everything complete; you get the certificate or permit sign-off.

Failed inspections usually trigger a reinspection fee ($75–$250 is common). Have the permit card and approved plans on site for every visit.

Questions to ask your building department

  1. Does this exact scope need a permit, and which trades need separate permits?
  2. Can a homeowner pull the permit, or must a licensed contractor?
  3. How are fees calculated — flat, by valuation, or by square footage? Is plan review extra?
  4. What drawings are required, and do they need a licensed designer or engineer?
  5. How long is review, and is expedited review available?
  6. Which inspections are required, and how do I schedule them?
  7. When does the permit expire if work stalls?

Before you hire

  • Verify the contractor’s license with your state board and ask for a certificate of insurance.
  • Put “contractor pulls all required permits” in the contract.
  • Never make the final payment before the final inspection passes.

Fee ranges are planning estimates from our permit cost calculators, not quotes. Permit rules are set locally — always confirm with your building department.